A team for the construction of a bathhouse from a log. A team of timber house builders. How to find a team for the construction of wooden houses

How are we different from other private construction teams?

Determining whether a team is better or worse is not easy at first glance. There are several aspects to consider here:

  1. We are carpenters by profession. All our work is related to construction wooden houses. We know perfectly well all the secrets of this work and all the features of wood. Which is not always the case with coven teams from the CIS.
  2. We are a team of Russian carpenters. Our task is not to rip off more money from you during the season. Our task is to build you a house made of timber so that you recommend us to your friends. After all, after finishing work on your house, we will continue to work in our country. Build houses for residents of Moscow and the Moscow region.
  3. We work under a pre-concluded agreement. The price of the house is specified in the contract. And it will not change during the work. Sometimes some super-scrupulous or unprofessional teams sin by the fact that during construction, additional mandatory (or invented by them) work suddenly arises that was not taken into account before the start of construction. And the customer has to pay extra. We don't have that!
  4. We guarantee quality built by us wooden house from timber!
  5. We use our own timber, which we ourselves harvest from the forest of the Kostroma taiga. We deliver it ourselves to your site in the Moscow region. Our team never purchases cheap timber for houses on dubious construction markets. Your house will be assembled exclusively from high-quality taiga timber!
  6. Very low prices for our houses made of timber! All the workers of our team are from the Kostroma region. Life is cheaper there. And, therefore, we charge less for work. Plus we use our own material, which also affects the low cost of our houses.
  7. We can build any house according to your project. From a small bathhouse to a large cottage! And everything will be done with the same quality and conscientiousness!

Hire our team of builders in Moscow and the Moscow region

If you need a team of professional builders to build a house in Moscow or the Moscow region, then hiring us is very easy! Leave a request for a call back on the website here, and we will call you back. Or call the phone number listed on the website!

We are waiting for your call!

Recently, services for the construction of baths and saunas have become increasingly relevant. This is not surprising, because baths, characterized by clean steam and hot air, are an excellent way to relax.

Today, in order to steam and relax, many resort to the services of commercial establishments that provide bathing services. However, this is quite inconvenient for a number of reasons:

  • Long journey to the appropriate organization providing bathing services
  • The need to spend a certain amount of time in line
  • Pre-registration for the provision of relevant services

Because of all these shortcomings, many people have a desire to build their own bathhouse. It is obvious that the construction of baths is a complex process that has a number of features that are known only to experienced professionals. Therefore, to build a bathhouse or sauna, you need to find a good construction team.

How to hire a team to build a bathhouse

Today there are many different private teams for the construction of baths and saunas. Many of them were recently formed and have little experience, so you need to be careful when choosing a contractor. With this approach, the client will be able to find workers who are ready to provide all the necessary services professionally and inexpensively. In general, when searching for private teams involved in the construction of baths and saunas, you need to pay attention to the following points:

  • Experience in providing construction services by the relevant work team
  • Prices for teams carrying out the construction of baths and saunas. It is recommended to carefully study the price list and compare prices for the services of private teams
  • Experience of working with a construction team various materials. Many companies work with timber and foam blocks, however, at the request of the client, it is possible to use other materials

What work crews use to build baths?

There are two types most commonly used building materials:

  • Beam, wood. Baths made in this way remain the most common today. Log houses are environmentally friendly. In addition, it is the log houses made of logs that convey the atmosphere of a classic bathhouse. The logs are typically bonded and sealed with resin
  • Foam blocks. Often used to build saunas. Foam blocks have excellent thermal insulation, which allows you to save temperature regime long time

The choice of building material depends on the goals pursued by the customer, the client’s financial situation and other factors. Professional companies, as a rule, offer a wide range of building materials from which you can build a bathhouse or sauna.

View the price list construction companies, you can compare their prices and hire suitable workers who are ready to do the job professionally and inexpensively using the specialized Yudu service.

I'm looking for a team of carpenters to build timber house 10.00x10.00 from sawn timber natural humidity section 200x200
The timber was brought from Arkhangelsk, selected Pine.

Stage 1 of work (strip foundation 40 cm wide + 3 rows of bricks) Already done!

Required:
1. Assembling a timber house 10.00x10.00 meters, two floors from timber 200x200 mm. (total volume of wood for the project is about 90 m3). It is necessary to remove the chamfers. External walls along the perimeter are chamfered only from the top edge. Internal walls and partitions on both sides, top and bottom.
2. The height of the first floor is 3.20 (16 pieces of timber), the second semi-attic floor is (8 pieces of timber). There are no plans for an attic. The height of the second half-attic under the ridge of the house. The total height of the house from the foundation to the ridge is 7.43 m according to the project
3. The roof is gable, with two gables.
4. The main walls of the house measure 10.00x10.00 along the perimeter - with the walls of the second floor rising by 1.60 meters, made of 200x200 mm timber. There are no plans to install windows and doors at this stage, only rough openings for ventilation inside the house. The beams are placed on a foundation 40 cm wide, closer to the inner edge, i.e. There is still room for finishing the outside with brick in the future.
5. The internal walls on the first floor and on the second floor are made of 200x200 mm timber. All walls of the second floor rise to the ridge of the roof (i.e. without forming an attic).
6. The larch backing board must be treated with an antiseptic. The floor and ceiling beams are made of 100x200 mm timber every 0.58-0.59 meters (per edge) (9 pieces per room, less according to the project). The floor joists must be sawn (embedded) into the 1st crown.
7. The gables of the second floor at the base are 10.40 meters and 3.00 meters high, made of 200x200 mm timber. On a rectangular bay window, a separate pediment at the base of 5.20 meters and a height of 1.50 meters is made of 200x200 mm timber with a separate gable roof(one slope in the same plane with the main roof).
8. Rafter structure (Sliding rafter device REQUIRED). Removal of the rafter beams by more than half a meter. (0.7-0.8)
9. The rafter structure is made of 50x200 mm boards every 0.60 meters.
10. The roof sheathing should be done as follows:
A) Wind-, waterproofing film
B) Counter grille (50x50 mm)
C) The roof sheathing is made of 25x150 boards (with pitches for metal tiles in the “Country” Grand Line profile).
D) All roof elements must be treated in two layers with fire protection (which is used in sub-zero temperatures).
D) Roof roofing material.
11. On the first and second floors inside the house, subfloors are made from 25x150 mm boards cranial bars 50x50 mm. (1st floor with antiseptic)
12. Waterproofing has been done between the foundation and the lower crown of the house (there is already 1 layer of glass insulation). It is necessary to lay 2 layers of roofing felt.
13. Between the crowns of the timber - antiseptic and only then inter-crown insulation (jute 20 cm). Antiseptic treatment is not required in internal partitions. Antiseptic treatment between the crowns of the timber is required only for the external walls.
14. Joining beams in corners and junctions interior walls, the length is made “in a half dovetail” ( warm corner) or another option for joining in a warm corner.
15. The assembly of a house from timber is carried out on wooden dowels only, step 1 meter, in front of the openings 10-20 cm.
16. The lining board, the 1st lower crown of the house, beams and boards of the 1st floor must be treated with an antiseptic (fire protection) in two layers.
17. The external walls of the house must be treated with 1 layer of fire protection.

Our materials:
1. Beam 200x200 - 316 pcs. - 75.85 cubic meters (walls, gables)
2. Beam 100x200 - 74 pcs. - 8.88 cubic meters (beams, two of them supporting on the 1st floor, on a five-meter span)
3. Beam 50x50 - 56 pieces - 0.75 cubic meters.
4. Beam 50x200 - 60 pcs. - 3.61 cubic meters (rafters 7 m, with extension)
5. Beam 25x150 - 5.7 cubic meters (2 cubic meters (1 floor, 2 floors, 2 floors, 1,7 sheathing).
6. Beam 25x50 - 40 pcs. - 0.3 cubic meters (control lathing).
COST OF WORK???